HOME > About NFI > Tokai Works
Safety & Ecology
Message from the President
Company Overview,History,Certifications
Management Principles,Code of Conduct,Environment/Safety Standards,Quality Standards
Nuclear Safety Policy,
Safety Culture Development Policy
Kumatori Works
Tokai Works
Access

Tokai Works

Tokai Works Overview

Tokai Works
Address 3135-41 Muramatsu, Tokai-mura, Naka-gun, Ibaraki 319-1196
Tel 81-29-287-8201
Fax 81-29-287-8217
Production capability BWR fuel: 250 tU/year
High temperature gas-cooled reactor fuel: 400 kgU/year
Site area Approx. 134,000 square meters
Building area Approx. 19,000 square meters
Number of employees Approx. 200 persons

History of Tokai Works

1965 Fuel fabrication facilities are built at Takeyama Research Laboratory. (The Furukawa Electric Co., Ltd.)

1977/Dec. Site preparation work started for Tokai Manufacturer (currently Tokai Works)
1980/Jan. BWR fuel fabrication business started at Tokai Manufacturer (currently Tokai Works)
1993/Mar. New plant for high temperature gas-cooled reactor fuel was built
1998/Sep. BWR fuel business division obtained ISO9001 certification for quality
2001/Nov. Tokai Works obtained ISO14001 certification for environment (2001 - 2017)
2004/Feb. Tokai Works obtained OHSAS18001 certification for occupational safety and health

Delivery record

BWR fuel for light water reactor: 18,551 assemblies (as of end of March 2017)

HTR fuel: 300 assemblies (as of end of March 2017)

ATR fuel: 687 assemblies (production ended in fiscal year 1999)

Operational plans for disaster prevention for nuclear power operator

As reguired by the law and Per our own initiative to be prepared in the event of a nuclear disaster, we drafted the Disaster Prevention for Atomic Energy Companies document, which we review and modify annually.

To top of page